Posted on

Cathedral Range Visitor Updates

Step construction at the Sugarloaf area

With plenty of work going on at the Cathedral Ranges, thought it would be good idea to get the information around. Not only are there major works going on with tracks, the new shelter and toilet facility is being built in the Sugarloaf area along with an Information Board to give visitors a little background of the area.

Laying the slab for new Shelter at Sugarloaf

The Jawbones track will be closed for major track works Monday to Friday from November the 29th until Christmas . This means the only access to the Farmyard and the Jawbone climbing areas is via Ned’s Gully or Sugarloaf Saddle. During this time period the track will reopen on weekends.

Also, please take note of the logging information below. As soon as PV have firm dates for when this work will actually begin we will let you know. St Bernards Track will most likely remain open for sometime yet. However Little River Track will close as soon as any works begin.

Logging of the pines at Cooks Mill will be recommencing this summer. At some stage in the near future machinery will be forming an access track through the central Cooks Mill campground and down the Little River Tr. Then the cutting of pines will begin. Over the Christmas holiday period the only logging activity taking place will be pine cutting from the 10th Jan, and log carting from the 17th Jan – all logging works will cease over the Australia Day weekend Friday, Saturday Sunday and Monday

The impacts logging will have on visitors are:

– Restricted camping around the central Cooks Mill area (Tweed Spur will remain open

– Closures to both Little River walking tr and St Bernards tr

– Sharing the road with logging trucks (after the 17th Jan, and possibly before Christmas)

– Machinery noise after the 10th of Jan and before Christmas.